Sign In | Join Free | My bjjsgy.com
China Suzhou orl power engineering co ., ltd logo
Suzhou orl power engineering co ., ltd
Suzhou orl power engineering co ., ltd Specializing in the production boiler unit China suppliers
Active Member

8 Years

Home > Water Wall Panels >

High Temperature 10 Ton Membrane Water Wall Panels

Suzhou orl power engineering co ., ltd

High Temperature 10 Ton Membrane Water Wall Panels

  • 1
  • 2

Brand Name : ORL Power

Model Number : Customization

Certification : ISO9001/SGS/TUV/ASME/EN

Place of Origin : Zhangjiagang,Jiangsu,China

MOQ : Negotiable

Price : Negotiable

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 500Ton/Tons per Month

Delivery Time : 50~100 Days

Packaging Details : Iron Frame Package

Name : Water Wall Panels

Usage : Industry/Power Station

Structure : Fire/Water Tube

Fuel : Coal/Gas/Oil-fired, Water Heat

Output : Hot Water/Steam

Dimension(L*W*H) : Customization

Contact Now

High Temperature Hot Water Heaters Water Wall Panels

Water Wall Panels Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube.

Water Wall Panels Introduction

A waterwall in a boiler is any furnace wall that is comprised of refractory and tubes in a water-tube boiler. The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler. They serve a two fold purpose here in that they capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler. And they also help keep the refractory cool .This prevents spalling of the refractory.

Water Wall Panels Parameters

Name Membrane water panel
Material Carbon steel,Alloy steel,etc.
Tube size Φ38 - 76 mm, Customization
Standard ISO , ASME
Model Studded
Dimension Customization
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Installation location around the boiler combustion chamber

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

High Temperature 10 Ton Membrane Water Wall Panels


Product Tags:

High Temperature water wall in boiler

      

Membrane water wall tubes in boiler

      
China High Temperature 10 Ton Membrane Water Wall Panels wholesale

High Temperature 10 Ton Membrane Water Wall Panels Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Suzhou orl power engineering co ., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 

Friendly Links: www.everychina.com

Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

Copyright © 2009 - 2024 bjjsgy.com. All rights reserved.